Mechanical Permit Fee Schedule

Section 1. The permit fee for inspecting heating, ventilating, ductwork, air-conditioning, exhaust, venting, combustion air, pressure vessel, solar, fuel gas, fuel oil, refrigeration systems, boilers, and appliance installations shall be fifty dollars ($50.00) for the first one thousand dollars ($1,000.00), or fraction thereof, of valuation of the installation plus six dollars ($6.00) for each one thousand dollars ($1,000.00) or fraction thereof.

Section 2.  
If it becomes necessary to make a re-inspection of a heating, ventilation, air conditioning or refrigeration system, or boiler installation, the installer of such equipment shall pay a re-inspection fee of thirty dollars ($30.00).

Section 3.  
When preliminary inspection is requested for purposes of permitting temporary operation of a heating, ventilating, refrigeration, or air-conditioning system, or portion thereof, a fee of fifty dollars ($50.00) shall be paid by the contractor requesting such preliminary inspection.  If the system is not approved for temporary operation on the first preliminary inspection, the usual re-inspection fee shall be charged for each subsequent preliminary inspection for such purpose.